PLM to Exenta: Design Adoption - "Check Generate UPC" Box
As of 11/13/2024.
When a design is adopted from PLM to Exenta (and the design color in PLM has the design [color] status set to "In Progress" or "In Progress (Added ar Market)") the Exenta Design Adoption Task will automatically check the "Generate UPC" Box at the style detail level (in Exenta) triggering the system to assign a UPC to the style detail.

_________________________________________________
Logic noted below for easy reference (X refers to anything that is not A -Active [InERP]):
- Via PLM>Exenta Adoption, upon (style [design]) creation, any ERP: Style Detail "Status:A" (and Generate UPC is blank,) Generate UPC flag to be set to Y
- Via PLM>Exenta ReAdoption, upon (style [design]) update: if the ERP: Style Detail "Status" is updated from X to A (and Generate UPC is blank,) Generate UPC flag to be set to Y
- Via PLM>Exenta ReAdoption, upon (style [design]) update: if the ERP: Style Detail "Status" is updated from A to X, the Generate UPC flag will not change (at this point UPCs have already been generated.)